Debris after a storm: separate cleanup from equipment review https://splashlens.com/blog/field-documentation/debris-after-a-storm-separate-cleanup-from-equipment-review/ A storm packet should separate site access, debris observations, and equipment assessment. This prevents a completed cleanup item from being mistaken for authorization to restart equipment. Record fields [ ] Safe site overview [ ] Observed debris locations [ ] Equipment assessment status [ ] Responsible trade contacts Boundary Do not treat a cleared path as evidence that electrical or mechanical equipment is ready to use. Record assessment status explicitly. Handoff question Which items remain unassessed after the cleanup work? Date of observation: ____________________ Source of information: ____________________ Unresolved items and next contact: ____________________ Reference only. These are editorial documentation prompts, not repair instructions, operating limits, legal advice, or confirmation of fit. Use the exact manufacturer instructions, applicable local requirements, and qualified judgment.